Our work at Olchfa Comprehensive School was to project manage the removal of the acoustic ceiling tiles and the strip flourescent lighting in the drama hall and replace it with new modern tile and grid system with recessed lighting, a new ceiling hung projector and finally the hall was decorated with bright colours to give it a more modern feel.



Olchfa Comprehensive School  

Project Management...

“School gets

 new Drama Hall”

The existing tiles contained amosite asbestos and were required to be removed to the current Control of Asbestos Regulations 2006 (CAR 2006). The work also had to completed in a two week timeframe.

The hall was completely sealed off and the asbestos removal was completed in three days, the hall was then given a environmental clean and a certificate was provided after the area had passed an air test and was safe to enter.

The contractor then went about hanging a new suspended ceiling grid and tile system with integrated recessed lighting modules which was designed by our electrical engineer.

Insulation was placed between the new ceiling and the flat roof above to improve energy efficiency.